Estimation Of Time Parameter Proportionality Ratios In Large Catchments: Case Study Of The Modder-Riet River Catchment, South Africa

dc.contributor.authorAllnutt, C.E.
dc.contributor.authorGericke, O.J.
dc.contributor.authorPietersen, J.P.J.
dc.date.accessioned2023-04-20T07:20:16Z
dc.date.available2023-04-20T07:20:16Z
dc.date.issued2020
dc.descriptionArticleen_US
dc.description.abstractCatchment response time parameters, for example, the time of concentration (TC), lag time (TL), and time to peak (TP) are fundamental to event-based design flood estimation in ungauged catchments. Hydrological literature often fails to clearly differentiate between the seven different time parameter definitions interchangeably used in practice and consequently, proportionality ratios are commonly applied. This article aims to investigate and establish the suitability of the currently recommended time parameter definitions and proportionality ratios for small catchments in larger sub-catchments exceeding 50 km2 by using an automated hyetograph–hydrograph analysis tool. The time parameter estimates proved to be highly variable, but the average time parameter proportionality ratios proved to be less significant and in all the sub-catchments, it was confirmed that the average proportionality ratios equal unity, that is, TC ≈ TL ≈ TP. Hence, the currently recommended TC:TL proportionality ratios of 1.417 and 1.667, are respectively not applicable at larger catchment levels. The establishment of unbiased empirical time parameter equations would remain an international challenge if the misinterpretation of the different time parameter definitions and use of incorrect time parameter proportionality ratios continue; hence, the results from this study, as well as others, should be considered for further investigation and/or implementation.en_US
dc.identifier.otherhttps://doi.org/10.1111/jfr3.12628
dc.identifier.urihttp://hdl.handle.net/11462/2435
dc.language.isoenen_US
dc.publisherJournal of Flood Risk Management Volume 13, Issue 3 e12628en_US
dc.relation.ispartofseriesJournal of Flood Risk Management;Volume 13, Issue 3 e12628
dc.subjectCatchment response timeen_US
dc.subjectLag timeen_US
dc.subjectRunoffen_US
dc.subjectRainfall spatial distributionen_US
dc.subjectSouth Africaen_US
dc.subjectTime of concentrationen_US
dc.subjectTime to peaken_US
dc.titleEstimation Of Time Parameter Proportionality Ratios In Large Catchments: Case Study Of The Modder-Riet River Catchment, South Africaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Estimation of time parameter proportionality ratios in large catchments.pdf
Size:
1016.87 KB
Format:
Adobe Portable Document Format
Description:
Research Article

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: